[Date Prev][Date Next][Thread Prev][Thread Next] - [Date Index][Thread Index][Author Index]

SPACEWALK COMPLETED



SUBMITTED BY ARTHUR N1ORC - AMSAT A/C #31468

**
SPACEWALK COMPLETED 6 HOURS 14 MINUTES
26 October 2007


STS-120 Mission Specialists Scott Parazynski and Doug Wheelock kicked 
off STS-120ís first spacewalk at 6:02 a.m. EDT to prepare Harmony for 
removal from Discoveryís payload bay. The excursion is scheduled to wrap 
up at about 12:32 p.m.

Mission Specialist Paolo Nespoli is the spacewalk coordinator, assisting 
the spacewalkers with their tasks from inside the spacecraft. Mission 
Specialists Stephanie Wilson and Clay Anderson and Expedition 16 Flight 
Engineer Daniel Tani are at the controls of the stationís Canadian-built 
robotic arm.

The spacewalkers have removed and stowed the S-band Antenna Structural 
Assembly. They also secured a Payload and Data Grapple Fixture onto 
Harmony that could not be in place during launch, removed contamination 
covers and disconnected the power cables linking Harmony to Discovery.

The station robotic arm operators are removing Harmony from the payload 
bay and will move it toward its position on Unity. Meanwhile, the 
spacewalkers are preparing the P6 truss for its relocation.

*Mission Information*
+ STS-120 Mission Overview 
<http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts120/index.html>
+ Harmony Node 2 
<http://www.nasa.gov/mission_pages/station/behindscenes/harmony_payload.html> 

+ Space Shuttle Discovery 
<http://www.nasa.gov/centers/kennedy/shuttleoperations/orbiters/discovery-info.html>
----
Sent via sarex@amsat.org. Opinions expressed are those of the author.
Not an AMSAT member? Join now to support the amateur satellite program!
Subscription settings: http://amsat.org/mailman/listinfo/sarex



AMSAT Top AMSAT Home