[Date Prev][Date Next][Thread Prev][Thread Next] - [Date Index][Thread Index][Author Index]
Re: Phase 4 versus Eagle
- Subject: [amsat-bb] Re: Phase 4 versus Eagle
- From: Joe <nss@xxxxxxx>
- Date: Sat, 15 Dec 2007 11:15:57 -0600
I'll agree with this completely.
While we are NO AMSAT, we here at Near Space Sciences, (one of the
balloon groups) have in the heat of the launch excitement have just
plain forgot to turn something "ON"
Without a formal checklist, where everything must be checked off the
list before liftoff, or lift off doesn't happen, something is bound to
be missed. it happens on our simple payloads, i can not even imagine
the complexity of a real AMSAT type of bird!
Joe WB9SBD
Robert McGwier wrote:
>Yet again, a statement based on no knowledge of the real situation.
>MOST space failures are caused by exactly this kind of thing. A wrench
>left behind and falling and puncturing a tank. Incomplete testing of
>this or that and a SUPPOSITION that it was "Okay". Satellites not
>bolted down when everyone assumed it was and a $100,000,000 satellite
>falls to the floor. These space things are extremely complex and if
>every system had to be tested to perfection, none could afford them.
>The goal of a good trained space/spacecraft engineer is to design robust
>systems that have the really supercritical things testable and the rest,
>well, the rules for that are in the adjoining testing manual (the local
>religious book, for prayer).
>
>Bob
>
>
>
_______________________________________________
Sent via AMSAT-BB@amsat.org. Opinions expressed are those of the author.
Not an AMSAT-NA member? Join now to support the amateur satellite program!
Subscription settings: http://amsat.org/mailman/listinfo/amsat-bb
AMSAT Home