[Date Prev][Date Next][Thread Prev][Thread Next] - [Date Index][Thread Index][Author Index]
AO-40: Heat Pipes working again!
- Subject: [amsat-bb] AO-40: Heat Pipes working again!
- From: Peter Guelzow <peter.guelzow@xxxxxxxxxxxx>
- Date: Sun, 11 Mar 2001 19:35:46 +0100
Dear All,
More good news: The Heat Pipes appear to be functional again!!
The S2 Tx was running about 35-37 °C in the last couple of weeks. It's
temperature is now running at 19-20 °C, which means that the heat pipes
are working again after the spin rate was lowered.
Also, the analog spin rate is now back close to calibration, showing 9.6
RPM currently.
The current magnetorqueing is performing very well and will complete
shortly. The attitude will be approx. 206/30 and 10 rpm.
With ALAT now out of the orbit plane, we can start changing ALON as well
as controlling ALAT and further spin down.
The next magnetorque will be uploaded on orbit 167, and is predicted to
reach s/c attitude 248/45 and 5.8 rpm, after 10 more perigees. The SA
will be then around 38 deg.
Here the history table for the spin and sun angle:
Expected Measured
Orbit rpm SA rpm SA
--------------------------------------------
156 17.59 39
157 16.93 38 16.73 38
158 16.18 37 15.87 37
159 15.43 36 15.20 35
160 14.70 35 14.66 34
161 13.95 34 13.91 33
162 13.22 33 12.99 32
163 12.50 33 12.11 30
164 11.80 31 11.36 28
165 11.11 30 10.74 27
166 10.41 29 9.82 25
73s Peter, DB2OS
AMSAT-DL
----
Via the amsat-bb mailing list at AMSAT.ORG courtesy of AMSAT-NA.
To unsubscribe, send "unsubscribe amsat-bb" to Majordomo@amsat.org
AMSAT Home