[Date Prev][Date Next][Thread Prev][Thread Next] - [Date Index][Thread Index][Author Index]
RUDAK testing started
- Subject: [amsat-bb] RUDAK testing started
- From: Jim White <jim@xxxxxxxxxxxxxxxxxxxxx>
- Date: Sat, 09 Dec 2000 14:36:30 -0700
- Delivered-To: fixup-amsat-bb@amsat.org@fixme
At about 12/09/2000 17:35 U the RUDAK experiment aboard P3d was powered on
for the first time. The RUDAK team in Colorado was able to command it to
bring up the level on one of its 9k6 modulators and was able to hear it via
the S2 transmitter. This is the first step in a long process to test all
the RUDAK subsystems and eventually the experiments accessed through RUDAK.
Power permitting RUDAK will be on continuously and the downlink available
when the S2 transmitter is on. The downlink frequency of the modulator
currently being tested is 2401.747 MHz. Other downlinks will likely be
tested in the next several days.
Jim
wd0e@amsat.org
jim@coloradosatellite.com
----
Via the amsat-bb mailing list at AMSAT.ORG courtesy of AMSAT-NA.
To unsubscribe, send "unsubscribe amsat-bb" to Majordomo@amsat.org
AMSAT Home